Wardrope & Carroll Engineering have years of experience in almost all facets of manufacturing and fabrication.

See just a few examples here of a broad spectrum of our clients requirements and specifications met.

We are known to recommend design suggesttions and improvements through our manufacturing and fabrication process that has significantly benefited our customers.
If we can find an improvement in your design, we will let you know.
The result is a longer life, an overall better product and a sound economic result.

Our mission

We take your ideas & concepts from engineering, complete through manufacturing, installation & training.
It is our goal to take these innovative ideas and turn them into manufacturing successes..
 
37.5m Pedestrian cycle way bridge – Vincentia Wardrope & Carroll were awarded the contract by Shoalhaven City council to supply, fabricate, and install a 37.5m long pedestrian and cycle way bridge located at Vincentia on the NSW south coast. This area of coastline is often voted as having the whitest sand in Australia. Great care was taken during the construction, especially during the civil stage, to protect the local environment. The bridge was painted in a special dulux 2 pack paint system, providing greater protection than galvanizing. The deck of the bridge is EFC decking color matched to the council’s requirements. Project completed May 2011
6m x 2.4m Aluminum rescue barges – Britton MarineWorking with Britton Marine, Wardrope & Carroll have successfully fabricated 8 off aluminum rescue barges for the VIC & NSW SES. All barges were fabricated using approved welding procedures. The barges feature a drop down front deck, foam under floor, as well as removable seating. Contract completed May 2011.
Gap Park redevelopment Stage 2Wardrope & Carroll were awarded the contract by Woollahra council to supply, fabricate and install 316 grade stainless steel hand railing and seats. The hand rail had recycled hard wood top rails and the seats have new hard wood seating. The seats also incorporated LED lighting strips mounted inside them. Project consisted of 34 seats 2500mm long and 28 meters of hand rail Project completed July 2011.
Pre-fabricated roadside rest stops – NSW RTAWardrope & Carroll were awarded the contract to supply, fabricate, deliver and install 2 off prefabricated road side rest stops. Both were installed on The Newell Hwy, between Gilgandra and Narrabri NSW. Each rest stop was completely pre-fabricated in the workshop. This included fixing them to pre-cast slabs which were also done in-house. They were then transported to site. Each rest stop has 2 off 4000L water tanks. One mounted underground for collection of waste, the other to collect and use rain water. All that was needed to be done on-site was to hook up the toilets to the tanks. The rest stops also had solar powered lights installed. Project completed July 2011
177 off twin 240L waste and recycling stations – Ryde CouncilRyde Council had previously had several prototype bin stations fabricated. They then put out a tender for an initial 120 off stations. Wardrope & Carroll were awarded the contract in September 2009, due to pricing, delivery schedules and design changes. All bins were made from polished 2mm 316 grade stainless steel. The waste stations incorporated removable ash trays, and foot leveling parts for ease of installation. Council increased the initial order to a final quantity of 177 stations plus spares. Contract completed January 2011.
8m x 4m x 4m stainless tank – Ovivo AustraliaWorking with the engineers from Ovivo Australia, Wardrope & Carroll supplied and fabricated an 8m x 4m x 4m high 304 grade stainless steel tank. There was also an extensive set of 50NB and 100NB 304 stainless pipe work and a galvanized platform and access ladder. All welding on the project was completed using approved GMAW welding procedures. On completion, the tank was transported to Melbourne. Contract completed May 2011.